Project Overview
CBR Commercials was contracted to deliver the full concreting works for a new HGV truck stop facility in the North West. The client required a reinforced concrete solution that could withstand high volumes of daily traffic, constant loading, and long-term exposure to the elements.

Scope of Work

  • Excavation and ground preparation across 5,000 m² of site
  • Installation of reinforced sub-base and drainage systems
  • Precision-laying of heavy-duty concrete designed for 40-tonne+ HGV use
  • Integration of forecourt, parking bays, and turning circles into a seamless, durable surface

Challenges

  • Tight project timeline of 12 weeks
  • Maintaining site access for ongoing logistics during construction
  • Engineering a surface specification capable of handling both static loading (parked HGVs) and dynamic traffic flows

Our Solution
CBR’s concreting specialists used a high-strength reinforced mix combined with precision-poured sectional bays. This allowed for phased construction, ensuring part of the facility remained operational throughout. Our experienced operators and modern fleet ensured consistency, accuracy, and long-term durability.

Outcome

  • Project delivered on time and within budget
  • A robust, low-maintenance surface designed to last 25+ years with minimal remedial work
  • Client praised our team for professionalism, site management, and technical knowledge

Client Feedback

“CBR Commercials transformed our vision into reality. The quality of their concrete work is second to none — our truck stop now operates at full capacity, and the reinforced yard gives us confidence it will last for decades.”